Doubel Combustion Chamber

All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.

Read More

High Temperature Incineration

Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.

Read More

Get Lastest News

There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation

Read More

Nanjing Clover Medical Technology Co.,Ltd.

Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201

Latest Product

Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.

Latest Post

New Courtice incinerator hits further delays


from: http://www.durhamregion.com/news-story/5682601-new-courtice-incinerator-hits-further-delays/

CLARINGTON — Clarington’s new energy-from-waste facility is going to be delayed a second time since the boilers aren’t operating properly and the continuing startup period could cost Durham Region an extra $1 million.

“I would rather see it delayed and done right than hurried,” said Clarington Mayor Adrian Foster.

The Durham York Energy Centre facility, located in Courtice, was scheduled to be fully operational on Dec. 14, 2014. Now the Durham York Energy Centre is not expected to be in full working order before the last quarter of 2015.

The significant systems of the EFW facility have been analyzed. The boiler temperature is high enough for the combustion process but the steam temperature isn’t high enough, and officials aren’t sure what the issue is, says Durham’s functions commissioner, Cliff Curtis.

The steam temperature has to be high enough to push the turbine-generator. If the steam is too cool it can damage the turbine.

“It’s like running a car without oil,” said Mr. Curtis.

Covanta, the company building and operating the facility for Durham and York regions, has taken the boilers down for modifications, according to Mr. Curtis. It’s expected to take three weeks to the repairs and modifications. Then there’ll be a four-week demonstration period, followed by a 30-day acceptance test.

“We’re not getting the temperature we expected from the boiler. Once we get the temperature up, I think everything will fall into place,” said Mr. Curtis. “It’s Covanta’s problem to provide us the product that performs the way they said, so they are going to take the time that they need.”

The delay means additional consultant costs for construction management, legal advice and baseline ambient air monitoring. A Durham Region works report stated Durham’s share of the extra costs is $1 million, which can be offered from a temporary draw the solid waste management reserve fund.

“What is the final price going to look like?” Stated Clarington Regional Councillor Joe Neal, who added that he still has concerns about the emissions fulfilling the Ministry of Environment rules. “There are clearly issues with getting it started out.”

Since Jan. 16, Durham has been charging Covanta a $10,000-a-day late fee for each day the EFW facility is not fully operational. The invoice has been delivered to Covanta, but it hasn’t been paid yet, according to Mr. Curtis.

In mid-February, the incinerator began burning its first haul of curbside garbage. It was part of a testing phase before the facility opens fully.

Durham cancelled landfill contracts and began sending garbage to the Courtice facility. Some garbage was burned at the EFW plant during the evaluation period, without producing power to the grid. Covanta has also been sending the trash to its incinerator in New York state, or landfills in the Niagara area.

Until the EFW facility is up and running, the Region only pays Covanta half price of the agreed upon per-tonne fee. However, Durham isn’t earning any money until the plant is fully operational and selling power back on the grid.

“We’re still on budget. I would rather be getting electricity sales on the grid,” said Mr. Curtis.

The plant construction is coming in slightly under budget, according to the functions commissioner.

There are a few loose ends that could end up costing Durham Region more cash. There is still debate with former property owners on the value of the land expropriated for the center, and a ruling is not expected until fall of next year. The final price for the utility construction and link costs is expected in coming months. The baseline ambient air monitoring runs until the EFW facility is operational, so the delay in opening signifies an ongoing monitoring price.

“There’s some small cost over-runs on some of the smaller things but generally we’re financially on track to bring this in on budget and we look forward to having it on line by the end of the year,” said Mr. Curtis.

HOW THIS IMPACTS YOU

The Durham York Energy Centre is designed to process up to 140,000 tonnes of waste every year, and create 17.5 gross megawatts of renewable energy — sufficient to power between 10,000 and 12,000 homes. A vital part of the economic situation for the energy-from-waste facility is dependent upon it generating electrical power revenue.


Animal Carcass Incinerator


Basic Info.

Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Additional Info.

Trademark:CLOVER

Product Description

Key Features:  * All versions with Dual combustion chamber.  * Stainless Steel chimney/stack, long life. *according to order  * High temperature, long life of incinerator.  * Free or minimum installation on site.  * High burn rate, from 10kgs to 500kgs per hour, up to 6ton per day.  *according to order  * New Design for pet animal cremation company.  * One year warranty on incinerator and parts in stock. 

Presently, we provide different series for local client requirements and design updated incinerator with our leading technology. Animal iacinerator, creature incincerator pricing, animal incineration, animal incineration emerging technologu, animal incineration equipment in china, animal incineration equipment  Costs, The updated design feature of our assortment of incinerators make them one of the most cost effective in the world.

Items Specification
YD Model YD-30 / YD-50 / YD-100 / YD-150 / YD-200 / YD-300 / YD-500 / YD-600
Main Product List Primary Combustion Chamber
Secondary Combustion Chamber
Mix Combustion Chamber
Smoke Filter Chamber
Incinerator Common Control Case
Stainless Steel Chimney
Italy oil/gas burner: 02 units
Oil Tank (if oil fuel)

Incinerator


Basic Info.

Pullution Sources:Solid Waste Processing
Processing Methods:Combined Water Treatment
Export Markets:Global

Additional Info.

Trademark:clover

Product Description

Items Specification
Model TS10(PLC) / TS20(PLC) / TS30(PLC) / TS50(PLC) / TS100(PLC)
Main Product List Double Combustion Chamber
Smoke Filter Chamber
PLC Mode Control Case
Stainless Steel Chimney
Italy oil/gas burner: 02 units
Oil Tank (if oil fuel)

Incinerator


Basic Info.

Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Additional Info.

Trademark:CLOVER
Origin:Nanjing
Production Capacity:1000 Sets Per Year

Product Description

2011 year is an important base for us. We reach developed country market and stabilize our old customers. Our incinerator use in Southeast Asia, Central Asia, Europe, small scale garbage incinerator, small scale gas incinerator, small scale incenaration, scale incineration, small scale incinerator cost, small scale incinerator designs, Middle East, Africa and Australia, etc.. Clover Incinerator has become one of the famous and biggest incinerator provider throughout the world. 

Product Main Program:  1. Medical waste incineration treatment.  2. Pet/Animal cremation business.  3. Municipal waste and other solid waste treatment. 

We can supply different model & design incinerator products for different market petition. Our large capacity incinerator(300/500kgs per hour) accept by customers and market finally.

Incinerator A1500


Basic Info.

Model NO.:A1500
Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Additional Info.

Trademark:CLOVER

Product Description

Nanjing Clover Medical Technology Co., Ltd..

Items/Model A360 A600 A900 A1200
Burning Rate *animal 20 kgs/Hr. 20 kgs/Hr. 30 kgs/Hr. 60 kgs/Hr.
Feed Capacity *animal 30 kgs 50 kgs 80 kgs 100 kgs
Equipment Weight 2300 kgs 3000 kgs 4000 kgs 4300 kgs
Primary Chamber (Liters) 360 600 900 1200
Secondary Chamber (Liters) 200 200 300 500
External Dimensions (cm) 145x90x175 175 x 100 x 180 200x160x230 220x180x360
Internal Dimensions (cm) 100x60x60 130 x 70 x 65 120x90x85 130x100x90
Oil Tank(Liters) 200 200 300 300
Door Opening (cm) 48 x 60 50 x 60 62 x 80 55 x 80
Chimney (M) 5 5 5 10
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES
1st. Chmaber Temperature 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree
2nd. Chmaber Temperature 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree

Key Features:  * All versions with Dual combustion chamber.  * Stainless Steel chimney/stack, long life. *according to order  * High temperature, long life of incinerator.  * Free or minimum installation on site.  * PLC Control Plane. *based on order  * New Design for pet animal cremation company.  * One year warranty on incinerator and parts in stock.

Clover's Social Media