Per your promotion for 300 kg.hr. Version– – We need to know the speed with return.
The amount of Kg. Of Gas would be needed for running this Style 10 hrs. everyday.
We have our very own Products Forwarding Agent.
We had an Agreement for Waste Keeping an eye on before their Civil Fight for 120 Tons/Day for one Town in North Africa.
Assigning door Mouth Size (mm): 760 * 760 (approx.) .
Burning Ability: 125 kg minimum/time (3-6times/ day), twin chamber, double burning system
Medical Waste Heater
Double Chamber (Key & & & & Secondary) with insulating material pieces (totally insulated internal refractory lining) in addition to
managed air blower for each room
Insulation/ Refractory Density: ≥ 100mm
Chamber plate thickness: ≥ 6mm
Fuel Kind: Gas based upon losing gas in combustion chambers
Waste Capacity: ≈ 150 Kg/Day
Incineration capability: ≈ 25 Kg/Day (Various waste invoicing in addition to waste elimination doors)
Heaters: In the very least with (02) heaters of automatic start as well as give up functions
Combustion performance: > > 97%
Temperature level: programmable temperature level with temp monitoring system
Home time: 2 second in secondary room
Home heating value: 4000 Kcal
Temperature Level Choice: ≈ minutes 800ºC to max 1200ºC
Electrical supply: 220V with solitary stage
Smokeshaft Plate Density: ≥ 5mm
Water scrubber: Rubbing using reagent like lime & & & & must constructed from SS 10 scale of non-corrosion residential properties as well as painted
exteriorly by devices quality heat repellent enamel
Chimney Elevation: in between 15-25 feet