- TECHNICAL SPECIFICATIONS OF THE INCINERATOR
 
- General Description
 
SCHEDULE 2
- Overall plant layout
 - Feed chamber/charging
 - Primary combustion chamber
 - Particulate scrubbers
 - Acid gas
 - The stack/chimney.
 - Minimum capacity of primary chamber = 10cubic meters
 - Burn rate (rate of waste incineration) = 10 kg per hour
 - Should have a full width counterbalance loading door allowing easy access to the main chamber for loading and removing ash.
 - The INCINERATOR should be NEMA approved in accordance with Environmental management and coordination (Waste management) Regulations of 2006.
 
- Scope Of Work
 
Previous experience in the supply, installation as well as appointing of burners
- Supply, install and commission an incinerator as provided in the technical specifications
 
- Provision for adherence to OSHA and other statutory requirement relating to Health and Safety of workers during execution of the works covered in this
 
- Assessment and preparation and construction of a standard incinerator shed with one waste storage room ( see the design )
 
- Provision of operation and maintenance manuals and drawings complete with maintenance schedule and
 
- Fuel oil storage tank- Mild steel 1000 liters capacity
 
- Onsite training for operation and maintenance
 
at least10kg per day
Basic Strategy design to Supply Overall plant design.
Genuine estate center with one waste storage space
- TECHICAL SPECIFICATIONS OF THE INCINERATOR
 
Deal Real estate designs with perfect cross air circulation
Chamber (Afterburner Optimum departure temperature must not be much less than 1100oC
- Primary Combustion
 
- This chamber should be equipped with burners that use low sulphur
 - The chamber should ensure a minimum exit temperature of 850 degrees
 - This unit should operate at over 1100 deg C to ensure complete
 - This chamber should be equipped with burners that use low sulphur
 - Heavy-duty steel casing
 - High quality refractory lining and insulation
 - Large full size top load door and liquid retention
 - 1 x oil fired ignition burners operated on/off
 
- Secondary Combustion Chamber (After burner)
 
- Heavy-duty steel casing
 - High quality refractory lining and insulation
 - 1 x oil burner
 - Should be fitted with burners that use low sulphur
 - Ensure secondary air supply is controlled.
 - Ensure residence time is not less than two seconds.
 - Ensure that the gas temperature as measured against the inside wall in the secondary chamber and not in the flame zone is not less than 1100 degrees
 - Ensure the emitted oxygen content of the emitted gases is not less than 11%
 - Ensure both primary and secondary combustion temperatures are maintained until all waste is completely
 
- Particulate Removers
 
Security interlock, Fan Newbie, Heating System on/ off switch/door security button, Vehicle layer button, temperature levels regulate device.
- Cyclone separator
 - Electrostatic precipitators
 - Fabric filters
 
- Chimney/Stack
 
- The chimney should have a minimum height of 10 meters above ground level and clear the highest point of the building by not less than 3 meters for all The topography and height of adjacent buildings within 50 meters radius should be taken into account.
 - The chimney should be visible to the operator from the feeding
 
- The minimum exit velocity should be 10 meters per second and at least twice the surrounding wind speed (Efflux velocity = wind speed x 2) whichever is higher to ensure no down washing of exiting
 - The point for measurement of emissions shall be
 
- Instrumentation
 
- Instrument for determining the inside wall temperature and not burner flame temperature must be provided for both primary and secondary
 - An audible and visible alarm must be installed to warn the operator when the secondary chamber temperature drops to below the required
 - A carbon monoxide and oxygen meter/recorder should be
 - A smoke density meter/recorder should be
 - A solid particulate meter/recorder should be
 - Any other instrument that may be considered
 
- Location / Siting of the Incinerator
 
- a) The incinerator must be sited in accordance with the relevant local municipal authority planning regulations and the topography of the site must be compatible with premises in the
 
- Emission Limits
 
- Combustion efficiency (C.E) shall be at least00% where C.E = %Carbon dioxide x 100 / [% Carbon dioxide + carbon monoxide]
 - The temperature of the primary chamber shall be 800 +/- 50 degrees centigrade
 - The secondary chamber gas residence time shall be at least 1 second at 1050 +/- 50 degrees centigrade with 3% oxygen in the stack
 - Opacity of the smoke must not exceed 20% viewed from 50 metres with naked
 - All the emission to the air other than steam or water vapour must be odourless and free of mist, fume and
 - A 99.99% destruction and removal efficiency (DRE) for each principal organic hazardous constituent (POHC) in the waste feed where DRE [ ( Win – Wout) /Win ] x
 
Key Combustion Chamber Minimum departure temperature level need not to be much less than 850oC
- The average dioxin and furan concentration in the emission should not exceed 80mg/m3 total dioxins and furans if measured for a period of 6 to 16
 
- Ease of Use
 
- Auto
 - No pilots to
 - Automatic control and temperature monitoring
 - Built-in skid facilitates placement
 
- Fuel Efficiency
 
- Rapid incineration means low fuel
 
- Up to 20kgs per hour (dependant on application).
 - Thick refractory lining rated to 1400 deg C in main chamber retains heat, increasing
 
- Quality Built to Last
 
- Heat resistant 3mm
 - Stainless steel
 
- Key Features
 
- Low running and maintenance costs
 - Fully Automatic and simple to operate control panel
 - Afterburner Preheat
 - Incineration Temperatures in Excess of 900 degrees C
 - 3 mm Steel Casing and Fully insulated
 - Dense Refractory Concrete Lining Rated to 1400 degrees C
 - Solid Hearth to Allow Maximum Burnout
 - Large Top Opening Lid For Easy Loading
 - Stainless Steel Flue as standard
 - 12 Months or 1000 hours
 - Optional Stainless Steel Casing
 - Heat Recovery System option
 
| 3.13 | Fuel and Capacity | |
| 1. | Low sulphur fuel | |
| 2. | Capacity (Cubic Mtr) | .10 | 
| 3. | Average Capacity | 40kg | 
| 4. | Fuel Consumption (ltrs / hr) | 3 | 
- External Dimensions
 
| 1. | Length (mm) 735 | |
| 2. | Width (mm) 500 | |
| 3. | Height Incl. Flue (mm) | 1960 | 
| 4. | Door Opening (mm) | 325 x 325 | 
- Internal Dimensions
 
| 1. | Length (mm) | 620 | 
| 2. | Width (mm) | 390 | 
| 3. | Height | 500 | 
- Operation
 
- Minimum Operating Temperature 950
 - Maximum Operating Temperature 1320
 
| 3. | Burn rate per hour | 5-20kgs | 
| 4. | Temperature Monitoring | Available | 
- Particulate Removers
 
Second Burning Optimum leave temperature level need to be no lot less than 1100oC
- Cyclone separator
 - Electrostatic precipitators
 - Fabric filters
 
- Chimney /Stack
 
- The chimney should have a minimum height of 10 meters above ground level and clear the highest point of the building by not less than 3 meters for all The topography and height of adjacent buildings within 50 meters radius should be taken into account.
 - If possible the chimney should be visible to the operator from the feeding
 - The addition of dilution air after combustion in order to achieve the requirement of these guidelines is
 - The minimum exit velocity should be 10 m/s and at least twice the surrounding wind speed (Efflux velocity = wind speed x 2) whichever is higher to ensure no down washing of exiting
 - Point for the measurement of emissions shall be
 
- Control Panel
 
- Control of 2 burners
 - Timer control 0- 12 hours
 - Integral fan timer control
 - Temperature and thermostatic control
 
SECTION VII
| NO: | REQUIREMENTS | SUPPLIER’S REMARKS | 
| 1. | Experience
 COST TIMETABLE FOR THING  | 
|
| 2. | 1 Year Maintenance Contract | |
| 3. | Work rate
 Price schedule for Supply, Installment, Checking out as well as Appointing of an incinerator for Turkwel Power Terminal  | 
|
| 4. | Design
 WONDERFUL BARGAIN 1 49,50,51,60,61,77,78,79,80,81,100 ENTIRE WHOLE LOT GREAT DEAL Offer Home styles with appropriate cross air flow  | 
|
| 5. | Standard control panel
 Chamber (Afterburner Maximum departure temperature should not be less than 1100oC  | 
|
| 6. | Combustion Chambers
 Security interlock, Follower Beginner, Heater on/ off switch/door safety switch, Car fold button, temperature levels regulate device. Key Combustion Chamber Minimum departure temperature level must not be much less than 850oC  | 
Secondly Combustion Optimum leave temperature level need to be less than 1100oC
SECTION VII
PRICE SCHEDULE FOR ITEM
| 1 | 2 | 3 | 4 | 5 | 6 | 
| Item | Description | Unit of sale | Quantity | Unit price | Total price | 
| 1. | Supply, install, and commission the incinerator as specified. | LOT | 1 | ||
| 2. | Construct a standard incinerator housing facility as per the drawing and architectural notes provided |  
 Rate schedule for Supply, Installment, Examining as well as Commissioning of an incinerator for Turkwel Power Station  | 
 
 GREAT DEAL  | 
||
| 4. | Construct one waste storage room (provide specs on room size, construction material etc) | LOT | 1 | ||
| 5. | Supply / adhere to  the requirement of OSHA 2007 act
 1  | 
LOT | 1 | ||
| 6. | Onsite training of Operation and Maintenance staff. | LOT | 1 | ||
| 7. | All the key Spares (Attach a separate List) | LOT | 1 | ||
| 8. | Supply and install 1000 liters Fuel oil storage tank and its secondary containment with Diesel oil level indicator and necessary piping with valves for visual checking of fuel level. | LOT | 1 | ||
| 9. | Supply of Operation and Maintenance Manuals. |  
 49,50,51,60,61,77,78,79,80,81,100  | 
1 | ||
| 10. | All other items not specified but necessary to complete the Installation. A separate list of these items to be attached. |  
 WHOLE LOT  | 
1 | 
| 11. | Fencing of a compound of 10 meter length by 10 meter width using Concrete poles high Gauge mesh wire , and a lockable gate. (Indicate size and design of gate) | LOT | 1 | ||
| Sub Total | |||||
| Discount (%) if any | |||||
| Applicable Taxes and Duties | |||||
| Total Cost in Kshs | 
LOT
									