Basic Info.
Product Description
Technology Respond(FAQ)
Q: What is kind of waste can utilize in this equipment? A: This gear for medical waste, pet animal, Municipal waste, reside waste. Prohibit any volatile and radiation material, liquid waste and gas waste.
Q: Incinerator Smoke Standard A: China Government Standard: No. GB18484-2001.
Q: Treatment capacity A: Typical Ability calculated by medical waste(lower calorific power (L. C. P): 3.0TH Kcal/Kg per hour), not indicate any waste material. The animal/pet combustion speed around 2/3 of average capacity.
Clover incinerator use time daily to 24 hours. Between every feed/combustion time, there are approximately 0.5-1 hours cooling time and time for feeding waste. Laboratory incinerator china maker, large animal incinerators, low-cost medical waste incinerator, pet crematory, pet incinerator deisel, pet incinerators, Actual combustion time per day is about 16 hours. The life span of incinerator between 5-10 year according to use.
Generally, we proposal small laboratory, small clinic use capacity under 20 kgs per hour. When incinerator use in hospital, please compute the waste output capacity around 2kgs per people each day. If there are 200 sickbed at the hospital, that's mean you need 1 incinerator capacity around 400kgs each day, change to capacity per hour is approximately 30-40 kgs per hour. According the operation time per day, waste material, budget, development, etc, you may use capacity from 30-50 kgs per hour incinerator. *How to compute Animal Cremation Burn Rate: 2/3 of the medical waste.
Q: Assembly and Testing A: We provide all documents and incinerators simple to setup and operation. Client can send people come to our factory to find out operation and installation. Generally, We do not send engineer to local site if not request. The dispatch cost is extra according to order. The second combustion chamber: 1000-1200 centi level.
Q: Incinerator Control Mode A: Default Control manner is common control instance. PLC mode according to order and model.
Q: Operation and maintenance costs A: Operation cost according to fuel consumption rate and power/staff, etc.
Annual around $500-$1000USD per year maintenance according version, use situation.
One individual can service 02 device incinerators. The team should have basic electrician knowledge to operate/inspect/maintaince incinerator/burner/blower according to performance user guider, and understand risk of medical waste to safeguard worker self with necessary protection component.
Q: The Residency time in secondary combustion chamber
A: 02 sec.
| Items/Model | TS10(PLC) | TS20(PLC) | TS30(PLC) | TS50(PLC) | TS100(PLC) |
| Burn Rate | 10 kg/hour | 20 kg/hour | 30 kg/hour | 50 kg/hour | 100 kg/hour |
| Feed Capacity | 20kg | 40kg | 60kg | 100kg | 200 kg |
| Control Mode | PLC | PLC | PLC | PLC | PLC |
| Combustion Chamber | 100L | 210L | 330L | 560L | 1200L |
| Internal Dimensions | 50x50x40cm | 65x65x50cm | 75x75x60cm | 100x80x70cm | 120x100x100cm |
| Secondary Chamber | 50L | 110L | 180L | 280L | 600L |
| Smoke Filter Chamber | Yes | Yes | Yes | Yes | Yes |
| Feed Mode | Manual | Manual | Manual | Manual | Manual |
| Voltage | 220V | 220V | 220V | 220V | 220V |
| Power | 0.5Kw | 0.5Kw | 0.5Kw | 0.7Kw | 0.7Kw |
| Oil Consumption (kg/hour) | 5.4–12.6 | 7.8–16.3 | 10.2–20 | 12.1–24 | 14–28 |
| Gas Consumption (m3/hour) | 6.2–11.4 | 8–15.7 | 9.8–20 | 9.9–26.1 | 10–32.2 |
| Temperature Monitor | Yes | Yes | Yes | Yes | Yes |
| Temperature Protection | Yes | Yes | Yes | Yes | Yes |
| Oil Tank | 100L | 100L | 100L | 100L | 200L |
| Feed Door | 30x30cm | 45x40cm | 55x50cm | 70x55cm | 80x60cm |
| Chimney | 3Meter | 3Meter | 5Meter | 5Meter | 10Meter |
| Chimney Type | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel |
| Residency Time | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. |
| Gross Weight | 1500kg | 2200kg | 3000kg | 4500kg | 6000kg |
| External Dimensions | 140x90x120cm | 160x110x130cm | 175x120x140cm | 230x130x155cm | 260x150x180cm |
