Doubel Combustion Chamber
All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.
Read MoreHigh Temperature Incineration
Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.
Read MoreGet Lastest News
There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation
Read MoreNanjing Clover Medical Technology Co.,Ltd.
Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201
Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.
Latest Post
economical incinerators
Temperature Controlled Heating System. Modern technologies: Heavy-duty covering, to be a top quality, rugged, reliable, inexpensive Burner with important control, extremely simple to run and likewise independent.
SOLID WASTE POLLUTED WITH HYDROCARBONS 300,680
50 kg per hour
Temperature level Controlled Heater. Modern modern technologies: Heavy-duty covering, to be a top quality, sturdy, trustworthy, budget friendly Heater with significant control, very simple to operate and likewise self-supporting.
Note: Comparable Modern Innovation and also/ or Tenderers Proposals cost.
Pig corpses/ walking pet canines as well as also larger animal carcasses cost-effective burners—-.
HYDROCARBON-CONTAMINATED DIRTS 88,680
MADE USE OF AIR FILTERS (AUTOMOTIVE AND ALSO ADDITIONALLY SIMILAR) 23,149
PAPER 4,956
hospital waste incinerator
Height: 82″ (208 cm) without stack, 100″ (254cm) with stack
Width: 39.5″ (99 cm) burn chamber, 58″(147cm) at base
Length: 62″ (157 cm) overall, 34″(86 cm) at base
Weight: 1800 ibs (roughly 816 kg)
Primary Chamber Volume: 10.5 cu.ft. (.28 cu/m)
Suggested Load Volume: 8 cu ft. (22 cu/m) load
Diameter of Stack: 12″ OD (30 cm)
Fuel: Diesel hospital waste incinerator
Fuel Consumption: 3-5gallons/hour (11-18 litre/hour)
Location: Level surface 7 feet (2 meters) from closest structure.
On-Site Incinerator Solutions for Health Centers in Kenya and Uganda
On-Site Incinerator Solutions for Health Centers in Kenya and Uganda
Effective medical waste management remains a critical challenge across East Africa, especially in Kenya and Uganda where expanding healthcare facilities face growing volumes of sharps, plastics, and infectious materials. Traditional disposal methods often fail to meet WHO standards, creating risks for both staff and surrounding communities. To address this, on-site incinerator solutions for Kenya county health centers have emerged as a practical and safe technology, allowing facilities to neutralize medical waste immediately after use.
Portable Incinerators with Enhanced Temperature Monitoring
In rural clinics and mobile health units, reliability and simplicity are essential. A portable incinerator with enhanced temperature thermometer in Kenya ensures accurate control of the combustion process. Continuous monitoring prevents underburning, reduces harmful emissions, and guarantees that medical waste―including syringes, infusion sets, and contaminated plastics―is destroyed at WHO-recommended temperatures above 1,100°C.
HICLOVER’s designs integrate digital temperature sensors, refractory-lined combustion chambers, and PLC automation, ensuring consistent high-temperature destruction even in environments with fluctuating fuel quality.
Humanitarian Aid Incinerator Supply for Kenya and Uganda
International NGOs, the United Nations, and donor-funded projects play a vital role in providing humanitarian aid incinerator supply in Kenya and Uganda. Refugee camps, remote health missions, and emergency relief operations require containerized mobile incinerators that can be rapidly deployed, installed, and operated without complex civil works.
HICLOVER supports humanitarian projects by supplying turnkey mobile incinerator units that are pre-assembled in ISO containers. These units can be transported by truck, powered by diesel or LPG, and made operational within hours. This is especially valuable in northern Kenya and border regions with Uganda, where displaced populations rely heavily on temporary health centers.
HICLOVER TS200: A Containerized Mobile Solution
The HICLOVER TS200 incinerator is a model well-suited for East African conditions. Key features include:
-
Average capacity of 200 kg/hour, suitable for county hospitals and larger health centers.
-
PLC-controlled dual chambers, ensuring secondary gas retention for 2+ seconds to minimize dioxin and furan emissions.
-
Enhanced refractory lining for long-term durability under high calorific waste streams such as plastics and infusion bags.
-
Integrated temperature display and control system, enabling operators to maintain safe and efficient combustion cycles.
-
Optional wet scrubber system, meeting donor-funded project requirements for emission reduction.
Local Relevance in Kenya and Uganda
-
County Health Centers in Kenya: With increasing decentralization of healthcare services, facilities in Kisumu, Eldoret, and Machakos benefit from on-site incinerators that eliminate the need to transport infectious waste over long distances.
-
Regional Hospitals in Uganda: In areas such as Gulu, Mbarara, and Jinja, hospitals gain from mobile incinerators that can handle diverse waste streams while remaining easy to maintain.
-
Humanitarian Camps: In Kakuma (Kenya) and Bidibidi (Uganda), large refugee settlements require containerized waste treatment systems that operate continuously under donor supervision.
Conclusion
The deployment of on-site incinerator solutions for Kenya county health centers, portable incinerators with enhanced temperature monitoring in Kenya, and humanitarian aid incinerator supply for Kenya and Uganda demonstrates a growing commitment to sustainable and safe medical waste disposal. With proven designs such as the HICLOVER TS200 containerized system, healthcare facilities and aid organizations can achieve reliable, high-temperature waste treatment in line with international standards.
For detailed specifications and procurement options, visit www.hiclover.com or contact sales@hiclover.com.
medical waste incinerator for sale
Waste type: health care waste
it’s carried from the ground level on a considerable steel support frame. Internally the shell is lined with calcium silicate insulation and a hot face combination of superb duty brickwork or higher strength castable.
the principal combustion chamber must ensure minimal exit temp is not less than 850? C.
Maximum consumption: 9Ltrs/hr
Limiting continuous service limitation 1000? C
Secondary room: 2 [email protected]? C
Chamber: should be refractory lined to the next standard;
Certification: NEMA (or other recognized) certification
Operating period: expected daily operating period 8 hours
Maximum rating: 450kW/hr
Ignition burners: fully packed oil type, complete with electric ignition and flame failure controls, wired with constant running fan and finish with all valves, motor and fan.
Typical consumption: 4.5Ltrs/hr
Environmental: NEMA ACT (EMCA) 1999, Waste Management regulations, 2006
C
One Manual Load Incinerator containing:
Refractory lined flanged chimney to a height of 10M above ground level
Hearth and lower part of room walls
Fully packed oil type, complete with electric ignition and flame failure controls, wired with constant running fan and finish with all valves, motor and fan.
1 off diesel-fired ignition burner — temperature controlled
The chimney/stack should have a minimum height of 10m above ground level
Calcium silicate
Manual loading door
Medical waste incinerator for sale Operation manual: two sets
Super duty firebrick
Service/maintenance manual: two sets
Limiting continuous service limitation 1500? C
Thermal conductivity: 0.095W/mk
Electrical supply: single phase: 220/240VAC; 50/60Hz
Documentation:
Burner: arranged for on/off operation
Chimney/Stack: Should be manufactured from refractory lined mild steel or higher quality air-cooled s/s.
Burner: arranged for on/off operation
Afterburner:
Ash: The waste will be reduced by 90~95% to depart 10-5% ash
Maximum rating: 450kW/hr
Control panel — automatic operation
High capacity secondary combustion chamber with residence time not less than two minutes @ p 850? C
Insulation:
Thickness: 100mm
Typical consumption: 3Ltrs/hr
Full sized majority load/ash removal door
Coaching: the Agent shall conduct a 2 days incinerators training after installation and commissioning of the equipment.
The Agent shall conduct a 2 days operation & maintenance training to the Biomedical engineering personnel after installation & commissioning of the equipment.
Strengthening Immunization Waste Management in Afghanistan with HICLOVER TS50 PLC Incinerators
Strengthening Immunization Waste Management in Afghanistan with HICLOVER TS50 PLC Incinerators
Addressing UNICEF’s Requirements for Safe Waste Disposal
UNICEF’s recent call for safe healthcare waste treatment under the National Expanded Program for Immunization (NEPI) highlights the urgent need for robust, environmentally sound incineration solutions in Afghanistan. With more than 1,500 health facilities generating sharps, used vials, and discarded safety boxes, the challenge lies not only in disposal but in ensuring compliance with global health and environmental standards.
The program outlines clear technical expectations: dual chamber incinerators, batch loading, primary combustion at ≥850°C, secondary chamber retention time of ≥2 seconds at 1100°C or higher, and units sized to fit facilities in Kandahar, Nangarhar, Herat, Balkh, and Paktya. Each site must safely process around 400 safety boxes and 1,000 vials daily, replacing unsafe practices like open burning or burial.
HICLOVER TS50 PLC: A Proven Match for Afghanistan’s Needs
The HICLOVER TS50 PLC incinerator provides the ideal solution. Compact yet powerful, the unit processes up to 50 kg per hour, aligning with UNICEF’s required throughput while fitting within site restrictions of 2.5 × 4 meters.
Key technical highlights include:
-
PLC Automatic Control: Ensures precise temperature regulation and automated safety shutdowns.
-
Dual Chamber Design: Primary chamber for solid waste breakdown; secondary chamber for flue gas treatment, ensuring complete destruction of pathogens and toxins.
-
High-Temperature Retention (HTR): Adjustable retention settings with thermocouples rated up to 1600°C for reliable monitoring.
-
Sealed Doors and Refractory Lining: Prevent gas leaks and withstand continuous high-temperature operation.
This configuration directly responds to UNICEF’s specification for safe treatment of infectious sharps, vials, and pathological residues, while also handling non-combustible waste such as glass ampoules, metal sharps, and containers through deformation.
Enhanced Safety and Reliability
Beyond combustion efficiency, HICLOVER has incorporated advanced safety and sustainability measures:
-
Operators PPE Kit: Each incinerator comes with three full sets of heat-resistant PPE (aprons, gloves, and boots) to protect health workers.
-
Spare Parts Package: A two-year supply of critical wear parts ensures uninterrupted operation in remote Afghan sites.
-
Fuel System Safety: Diesel oil lines are fitted with flame arrestors, automatic shut-off valves, fire-resistant insulation, and a diesel leak detection system to prevent accidents.
-
Noise & Emissions Control: Units operate below 85 dBA, with optional wet scrubbers to minimize acid gases and visible smoke.
Strategic Impact for Afghanistan
Deploying the TS50 PLC incinerators at regional Expanded Program for Immunization hubs will:
-
Provide a standardized, WHO-compliant disposal method for immunization waste.
-
Reduce risks from open burning and uncontrolled dumping.
-
Protect healthcare staff with modern safety equipment and training.
-
Establish a scalable model for other Afghan provinces and neighboring regions facing similar waste management gaps.
SEO Keywords
afghanistan medical waste incinerator tender
HICLOVER TS50 PLC dual chamber incinerator
hospital immunization waste disposal Afghanistan
UNICEF supported healthcare incinerator project
diesel incinerator with flame arrestors and leak detection
two year spare parts incinerator package Afghanistan
Learn More
HICLOVER provides CE-certified, ISO-compliant incinerators designed for healthcare, humanitarian, and oilfield operations worldwide.
-
Website: www.hiclover.com
-
Email: sales@hiclover.com
-
WhatsApp: +86-13813931455