Doubel Combustion Chamber

All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.

Read More

High Temperature Incineration

Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.

Read More

Get Lastest News

There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation

Read More

Nanjing Clover Medical Technology Co.,Ltd.

Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201

Latest Product

Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.

Latest Post

Medical Incineraotors chamber of post combustion


1.A chamber of post combustion of gases
A burner of combustion of gases,
A device of injection of air allowing a total re-combustion of gases,
A device of air inlet of cooling of waste gases,
A sheath of evacuation of the gases burnt,
Carcass in strong sheet steel with support of connection
Composition of the refractory;
Refractory concrete:
Thickness :>150mm
Nature: 65%% of Al203
Insulate in fibrous panels:
Thickness: >85mm
Nature: Calcium
Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic ignition, permanent ventilation, 
electromagnetic sluice gate of regulation and isolating valve.
A secondary injection of air to ensure perfect oxygen content.
2.A control box ensuring the complete cycle of combustion.
3.Fan:
Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and following the control of 
the automatic cycle.
4.Controls and regulations:
Control box watertight to dust, including:
A switch circuit breaker for each engine (ventilators and burners).
A timer with adjustable temporization for the regulation of each burner.
A regulator with digital watching for the temperature of combustion.
A regulator with digital watching for the temperature of post-combustion.
Electric box.
5.The de-ashing must be done in the bottom of the combustion chamber or the de-ashing should be automatic or manual batch de-ashing.
6.Process filtering system: scrubber to be mentioned as optional
7.Emission standards compliance: BS 3316 or equivalent standard
8.Capacity to treat plastic: not less than 40% by weight
9.CE manufacturing compliance: BS EN 746-2-1997


Medical Incineraotors chamber of post combustion


1.A chamber of post combustion of gases
A burner of combustion of gases,
A device of injection of air allowing a total re-combustion of gases,
A device of air inlet of cooling of waste gases,
A sheath of evacuation of the gases burnt,
Carcass in strong sheet steel with support of connection
Composition of the refractory;
Refractory concrete:
Thickness :>150mm
Nature: 65%% of Al203
Insulate in fibrous panels:
Thickness: >85mm
Nature: Calcium
Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic ignition, permanent ventilation, 
electromagnetic sluice gate of regulation and isolating valve.
A secondary injection of air to ensure perfect oxygen content.
2.A control box ensuring the complete cycle of combustion.
3.Fan:
Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and following the control of 
the automatic cycle.
4.Controls and regulations:
Control box watertight to dust, including:
A switch circuit breaker for each engine (ventilators and burners).
A timer with adjustable temporization for the regulation of each burner.
A regulator with digital watching for the temperature of combustion.
A regulator with digital watching for the temperature of post-combustion.
Electric box.
5.The de-ashing must be done in the bottom of the combustion chamber or the de-ashing should be automatic or manual batch de-ashing.
6.Process filtering system: scrubber to be mentioned as optional
7.Emission standards compliance: BS 3316 or equivalent standard
8.Capacity to treat plastic: not less than 40% by weight
9.CE manufacturing compliance: BS EN 746-2-1997


Clover's Social Media