Doubel Combustion Chamber

All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.

Read More

High Temperature Incineration

Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.

Read More

Get Lastest News

There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation

Read More

Nanjing Clover Medical Technology Co.,Ltd.

Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201

Latest Product

Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.

Latest Post

Incinerator with Ease of destruction in weight: 60 Kg/h.


Capacity of destruction in weight: 60 Kg/h.

it ought to be able to operate not less than 10 hours/day

This incinerator has to be able to destruct all combustible wastes produced by hospitals, private practices, laboratories, institutes, etc…

Design Specification: Types A, B, C, D, and E of medical waste 

“PYROLYTIC” combustion, by controlling the gasification of waste.

The incinerator should avoid the discharge of black smoke and fine dust, (Smokeless) during the loadings.

it ought to be able to decrease the volume of wastes by 98%.

it ought to be able to hold emission in the second burn with gasoline residence of less than 2 seconds.

The incineration should be completely free from visible smoke in addition to offensive odours.

The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg

The Temperatures of combustion: Minimum will be 850oC and max 1400oC

Post combustion: 1100oC.

The Inner diameter of the Chimney: Ø 400 and its elevation: 8 m

The Volume of the combustion chamber: 1.200 L

The Dimension of the door for loading in cm: 70×70.

Burner operation should be Automatic On/Off

Fuel: petrol

The provider must provide  necessary information for the best of  the installation

This incinerator with”PYROLYTIC” combustion should have:

A combustion chamber of waste:

* Perfectly tight door for the manual loading of waste.  The loading should be Manual, Batch Load 

* A burner of light that the use is restricted to the ignition of waste.

* Frontage of loading door seals gone up on hinges, wheel of screw plug, flexible joint, and stuffing insulating from refractory.

* The insulation of the combustion chamber should be composed of refractory bricks, having a high content of aluminium and insulates bricks to be able to assure a minimum temperature on   the outside sheet metal.

* Composition of the refractory;

Refractory concrete :

. Thickness : ≥100 mm

. Nature: 42% of Al203

Insulate in fibrous panels:

. Thickness: ≥75 mm

Nature: Calcium silicate.

* Burner of light of waste, with gas, regular mono-bloc casting directing stirring flame, lighting and safety of electronic ignition, permanent venting, electromagnetic sluice gate of regulation and isolating valve.

* Plate of combustion in Carborundum, preventing the fixing of glass and slags. 


Negozio tiffany milano the whole of Europe has 423 waste incinerators


Among them,tn, the steel industry generated two? English number is much higher than normal number of waste incineration. � Rock hillsIncineration plant turned landscapeIn recent years, with advances in technology, incineration, waste incineration plants residing overseas to implement a large-scale restructuring, through greater environmental standards to change the old incinerator, off a little plant, built manufacturers make incineration plants to scale,veste barbour homme, large-scale development.According to data, socket hogan, in 2010, there are 35 countries and areas have built more than 2,barbour femme,000 lives incineration plant,air jordan 4 retro rouge noir, mainly in Europe,barbour global, the United States, Japan and other developed nations and regions. Interestingly, lots of the incineration plant is not only a waste disposal facilities, but also due to new and unique designs, a local landmark, is now a gorgeous landscape.As of the end of 2009, the Japanese waste incineration rate has reached 79.8%; the whole of Europe has 423 waste incinerators, burning about 0.25 kg per capita / day; Germany, Canada and other nations, to be buried in the ground for decades to re-dig the garbage incineration electricity production; the United States a total of 220 units of existing incinerator, the complete size of 93,943 tons / day waste incineration capacity is 2 times China over the same period.2010 statistics.

the fact that what is happening behind the let unforeseen. This gentleman seems to sit down,”restless”, not only accounts for part of the fact that the position, but after the car has been in his legs from side to side, occasionally touch the very fact that the legs on her husband to send information Ms. Zhang said,”this guy next to me,abercrombie paris, half of my fork legs to the chair.” The fact that the husband is very angrily into the fact that the reply”What?” “Be cautious purse, had sent me JIAJIANG info,abercrombie paris, I’ll pick you up. “” supporting the vacancy,abercrombie, then another place”and other info. However.

there are 35 countries worldwide and has more than 2,barbour paris,000 regional solid waste incineration plants, mainly in Europe, the USA, Japan and other developed nations and areas,giuseppe zanotti pas cher, and 70-90% of household waste are incinerated deal with.Beijing News reporter Rao Pei edition have writtenInformation provided / Beijing Municipal Administration Commission(Original title: end of next year Beijing will be 23,000 tons of waste pr”Popping”,abercrombie paris, a loud slap startled passengers in the vehicle, with a surprised look, we’ve looked toward the source of the sound, and saw a young girl standing on the chair face angrily, sitting next to her of a guy then burst into his mouth and shouted,”hey, you do not misunderstand!” “I don’t tell you to say, we went into the police station, your own hair nearly white people how to draw this stem thing? In the police station, the young lady told reporters about what was going on.Ms. Zhang is Leshan, a while ago due to the things the company was sent to Chengdu meeting. At 14:00 on the 10th, the fact that the new South Gate Station from Chengdu, Leshan back car ready (microblogging),nike tn soldes, to board the bus following having a place to sit near the window, a guy got into it, in a patrol car After the circle sat down next to Ms. Zhang’s. “He sat down and put my seat back also accounted for one-third, and the legs Zhang very open, I think I also relatively thin, give him nothing.”

because the people in the car were full,moncler pas cher, so for the position isn’t very convenient, a little girl man style Ms. Zhang said:. “Aging mother to see him do tricks wisdom, you incomes for taxation, I pretended to sleep.” After about 20 minutes the bus departure, the man started to intensify,tiffany outlet online, but the fact that all this is seen in the eyes. “He put his black bag in your lap, and then the following outstretched hand from the bag and started to touch just about to take it back,parajumpers homme, to test a few times after the beginning of touch.

by: http://voipshoip.com/negozio-tiffany-milano-the-whole-of-europe-has-423-waste-incinerators/


Adjumani Hospital incinerator blows up


ADJUMANI.

For the past four months, support staff at the hospital have been dumping medical waste within the enclosure of the incinerator rather than burning it.

The hospital administrator, Mr Michael Ojja, told Daily Monitor on Wednesday that the incinerator broke down because of continuous burning of accumulated waste from the hospital.

“The waste has grown due to the overwhelming number of admissions and individuals visiting the outpatient department. But we need to find solutions to protect the staff and surroundings,” Ojja said.

He said the incinerator was too little to eliminate the hospital’s voluminous medical waste.

Patients admitted to the general ward near the incinerator expressed fear of infections arising from bad disposal of hazardous medical waste.

As stated by the 2013-2014 annual health industry performance record, Adjumani Hospital registers 11,731 in-patients, 83,953 outpatients and 1,695 deliveries.

Scientific facts
Incineration of heavy metals or materials with high metal content (in particular lead, mercury and cadmium) releases toxic metals to the environment and the burnt medical waste contains micro-organisms that are potentially harmful to human beings, according to WHO.


hot medical waste disposing machine, Operation Condition: 8-16 hr/ day


hot medical waste disposing machine, Operation Condition: 8-16 hr/ day 
Control: Built-in data recording
Operating temperature: Incinerator 
/Primary Combustion Chamber
Primary Chamber: 900 – 1200 0C


Type: horizontal/vertical
Temperature:  1200- 1300 oC
Residence time of gases : >2 seconds
Ash Residue: <5% of original waste size
Ash Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ash
Flue gas treatment   system : Capable of treating the flow of flue  gas as the incinerator is operating at its maximum capacity
Auxiliary device: Water level gauge, pressure sensor, PH sensor..etc 
Auxiliary device: Fuel cut-off device
Waste  feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time                                                                                                                                      
Chimney (Stack):
Type: Vertical type
height:>7 meter’
Material: Fireproof cast, stainless steel
OUTPUT: 
GAS- SMOKELESS,ODORLESS 
ASH -Max <5% of original waste size
Reduction of Pollutant gas SO2, HCL, HF and line particulate
Emission standard:
WHO/ European
Test report for emission testing provided?
Heat exchange mode: Automatic

Type: continuous loading, Top LoadingCapacity/Burn rate per hour: 250 -300 kg/hr Material:External- 3 layers Internal lining:  a Flame proof material of pre-fired refractory bricks with Aluminium lining, resistant to corrosive waste or gas and to thermal shockSecondary Combustion Chamber:


Clover's Social Media