Doubel Combustion Chamber
All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.
Read MoreHigh Temperature Incineration
Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.
Read MoreGet Lastest News
There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation
Read MoreNanjing Clover Medical Technology Co.,Ltd.
Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201
Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.
Latest Post
Waste incinerator producers from china
Incinerate: medical waste and general waste Capacity to burn waste:
· Use: For drugs
· With Chassis to be Mounted in truck/lorry
· May have a primary and secondary combustion chamber
· Must have a dilution chamber
· Ability: 100 Kgs per hour
clinical facility incinerator manufacturers
- TECHNICAL SPECIFICATIONS OF THE INCINERATOR
- General Description
SCHEDULE 2
- Overall plant layout
- Feed chamber/charging
- Primary combustion chamber
- Particulate scrubbers
- Acid gas
- The stack/chimney.
- Minimum capacity of primary chamber = 10cubic meters
- Burn rate (rate of waste incineration) = 10 kg per hour
- Should have a full width counterbalance loading door allowing easy access to the main chamber for loading and removing ash.
- The INCINERATOR should be NEMA approved in accordance with Environmental management and coordination (Waste management) Regulations of 2006.
- Scope Of Work
Previous experience in the supply, installation as well as appointing of burners
- Supply, install and commission an incinerator as provided in the technical specifications
- Provision for adherence to OSHA and other statutory requirement relating to Health and Safety of workers during execution of the works covered in this
- Assessment and preparation and construction of a standard incinerator shed with one waste storage room ( see the design )
- Provision of operation and maintenance manuals and drawings complete with maintenance schedule and
- Fuel oil storage tank- Mild steel 1000 liters capacity
- Onsite training for operation and maintenance
at least10kg per day
Basic Strategy design to Supply Overall plant design.
Genuine estate center with one waste storage space
- TECHICAL SPECIFICATIONS OF THE INCINERATOR
Deal Real estate designs with perfect cross air circulation
Chamber (Afterburner Optimum departure temperature must not be much less than 1100oC
- Primary Combustion
- This chamber should be equipped with burners that use low sulphur
- The chamber should ensure a minimum exit temperature of 850 degrees
- This unit should operate at over 1100 deg C to ensure complete
- This chamber should be equipped with burners that use low sulphur
- Heavy-duty steel casing
- High quality refractory lining and insulation
- Large full size top load door and liquid retention
- 1 x oil fired ignition burners operated on/off
- Secondary Combustion Chamber (After burner)
- Heavy-duty steel casing
- High quality refractory lining and insulation
- 1 x oil burner
- Should be fitted with burners that use low sulphur
- Ensure secondary air supply is controlled.
- Ensure residence time is not less than two seconds.
- Ensure that the gas temperature as measured against the inside wall in the secondary chamber and not in the flame zone is not less than 1100 degrees
- Ensure the emitted oxygen content of the emitted gases is not less than 11%
- Ensure both primary and secondary combustion temperatures are maintained until all waste is completely
- Particulate Removers
Security interlock, Fan Newbie, Heating System on/ off switch/door security button, Vehicle layer button, temperature levels regulate device.
- Cyclone separator
- Electrostatic precipitators
- Fabric filters
- Chimney/Stack
- The chimney should have a minimum height of 10 meters above ground level and clear the highest point of the building by not less than 3 meters for all The topography and height of adjacent buildings within 50 meters radius should be taken into account.
- The chimney should be visible to the operator from the feeding
- The minimum exit velocity should be 10 meters per second and at least twice the surrounding wind speed (Efflux velocity = wind speed x 2) whichever is higher to ensure no down washing of exiting
- The point for measurement of emissions shall be
- Instrumentation
- Instrument for determining the inside wall temperature and not burner flame temperature must be provided for both primary and secondary
- An audible and visible alarm must be installed to warn the operator when the secondary chamber temperature drops to below the required
- A carbon monoxide and oxygen meter/recorder should be
- A smoke density meter/recorder should be
- A solid particulate meter/recorder should be
- Any other instrument that may be considered
- Location / Siting of the Incinerator
- a) The incinerator must be sited in accordance with the relevant local municipal authority planning regulations and the topography of the site must be compatible with premises in the
- Emission Limits
- Combustion efficiency (C.E) shall be at least00% where C.E = %Carbon dioxide x 100 / [% Carbon dioxide + carbon monoxide]
- The temperature of the primary chamber shall be 800 +/- 50 degrees centigrade
- The secondary chamber gas residence time shall be at least 1 second at 1050 +/- 50 degrees centigrade with 3% oxygen in the stack
- Opacity of the smoke must not exceed 20% viewed from 50 metres with naked
- All the emission to the air other than steam or water vapour must be odourless and free of mist, fume and
- A 99.99% destruction and removal efficiency (DRE) for each principal organic hazardous constituent (POHC) in the waste feed where DRE [ ( Win – Wout) /Win ] x
Key Combustion Chamber Minimum departure temperature level need not to be much less than 850oC
- The average dioxin and furan concentration in the emission should not exceed 80mg/m3 total dioxins and furans if measured for a period of 6 to 16
- Ease of Use
- Auto
- No pilots to
- Automatic control and temperature monitoring
- Built-in skid facilitates placement
- Fuel Efficiency
- Rapid incineration means low fuel
- Up to 20kgs per hour (dependant on application).
- Thick refractory lining rated to 1400 deg C in main chamber retains heat, increasing
- Quality Built to Last
- Heat resistant 3mm
- Stainless steel
- Key Features
- Low running and maintenance costs
- Fully Automatic and simple to operate control panel
- Afterburner Preheat
- Incineration Temperatures in Excess of 900 degrees C
- 3 mm Steel Casing and Fully insulated
- Dense Refractory Concrete Lining Rated to 1400 degrees C
- Solid Hearth to Allow Maximum Burnout
- Large Top Opening Lid For Easy Loading
- Stainless Steel Flue as standard
- 12 Months or 1000 hours
- Optional Stainless Steel Casing
- Heat Recovery System option
| 3.13 | Fuel and Capacity | |
| 1. | Low sulphur fuel | |
| 2. | Capacity (Cubic Mtr) | .10 |
| 3. | Average Capacity | 40kg |
| 4. | Fuel Consumption (ltrs / hr) | 3 |
- External Dimensions
| 1. | Length (mm) 735 | |
| 2. | Width (mm) 500 | |
| 3. | Height Incl. Flue (mm) | 1960 |
| 4. | Door Opening (mm) | 325 x 325 |
- Internal Dimensions
| 1. | Length (mm) | 620 |
| 2. | Width (mm) | 390 |
| 3. | Height | 500 |
- Operation
- Minimum Operating Temperature 950
- Maximum Operating Temperature 1320
| 3. | Burn rate per hour | 5-20kgs |
| 4. | Temperature Monitoring | Available |
- Particulate Removers
Second Burning Optimum leave temperature level need to be no lot less than 1100oC
- Cyclone separator
- Electrostatic precipitators
- Fabric filters
- Chimney /Stack
- The chimney should have a minimum height of 10 meters above ground level and clear the highest point of the building by not less than 3 meters for all The topography and height of adjacent buildings within 50 meters radius should be taken into account.
- If possible the chimney should be visible to the operator from the feeding
- The addition of dilution air after combustion in order to achieve the requirement of these guidelines is
- The minimum exit velocity should be 10 m/s and at least twice the surrounding wind speed (Efflux velocity = wind speed x 2) whichever is higher to ensure no down washing of exiting
- Point for the measurement of emissions shall be
- Control Panel
- Control of 2 burners
- Timer control 0- 12 hours
- Integral fan timer control
- Temperature and thermostatic control
SECTION VII
| NO: | REQUIREMENTS | SUPPLIER’S REMARKS |
| 1. | Experience
COST TIMETABLE FOR THING |
|
| 2. | 1 Year Maintenance Contract | |
| 3. | Work rate
Price schedule for Supply, Installment, Checking out as well as Appointing of an incinerator for Turkwel Power Terminal |
|
| 4. | Design
WONDERFUL BARGAIN 1 49,50,51,60,61,77,78,79,80,81,100 ENTIRE WHOLE LOT GREAT DEAL Offer Home styles with appropriate cross air flow |
|
| 5. | Standard control panel
Chamber (Afterburner Maximum departure temperature should not be less than 1100oC |
|
| 6. | Combustion Chambers
Security interlock, Follower Beginner, Heater on/ off switch/door safety switch, Car fold button, temperature levels regulate device. Key Combustion Chamber Minimum departure temperature level must not be much less than 850oC |
Secondly Combustion Optimum leave temperature level need to be less than 1100oC
SECTION VII
PRICE SCHEDULE FOR ITEM
| 1 | 2 | 3 | 4 | 5 | 6 |
| Item | Description | Unit of sale | Quantity | Unit price | Total price |
| 1. | Supply, install, and commission the incinerator as specified. | LOT | 1 | ||
| 2. | Construct a standard incinerator housing facility as per the drawing and architectural notes provided |
Rate schedule for Supply, Installment, Examining as well as Commissioning of an incinerator for Turkwel Power Station |
GREAT DEAL |
||
| 4. | Construct one waste storage room (provide specs on room size, construction material etc) | LOT | 1 | ||
| 5. | Supply / adhere to the requirement of OSHA 2007 act
1 |
LOT | 1 | ||
| 6. | Onsite training of Operation and Maintenance staff. | LOT | 1 | ||
| 7. | All the key Spares (Attach a separate List) | LOT | 1 | ||
| 8. | Supply and install 1000 liters Fuel oil storage tank and its secondary containment with Diesel oil level indicator and necessary piping with valves for visual checking of fuel level. | LOT | 1 | ||
| 9. | Supply of Operation and Maintenance Manuals. |
49,50,51,60,61,77,78,79,80,81,100 |
1 | ||
| 10. | All other items not specified but necessary to complete the Installation. A separate list of these items to be attached. |
WHOLE LOT |
1 |
| 11. | Fencing of a compound of 10 meter length by 10 meter width using Concrete poles high Gauge mesh wire , and a lockable gate. (Indicate size and design of gate) | LOT | 1 | ||
| Sub Total | |||||
| Discount (%) if any | |||||
| Applicable Taxes and Duties | |||||
| Total Cost in Kshs |
LOT
Medical Waste Incinerator for Hospitals ― HICLOVER TS500 (500 kg/hr, Diesel, Containerized System)
Medical Waste Incinerator for Hospitals ― HICLOVER TS500 (500 kg/hr, Diesel, Containerized System)
Hospitals generate a large amount of infectious waste every day, including sharps, dressings, and laboratory materials. Safe and efficient on-site treatment is essential to prevent contamination and comply with health and environmental regulations. The HICLOVER TS500 medical waste incinerator provides a reliable, high-capacity solution tailored for hospital and institutional use.
1. Overview
The HICLOVER TS500 is designed for hospitals requiring a throughput of 500 kg per hour (≈ 2000 L per batch). It is a diesel-fired, front-loading, containerized incinerator system built for rapid installation and mobile deployment. The compact container design allows easy transport and operation even in remote or temporary medical facilities.
2. Key Features
-
Capacity: 500 kg/hr (2000 L chamber volume)
-
Fuel Type: Diesel oil (optional LPG or natural gas)
-
Design: Front-door loading, dual-chamber combustion
-
Structure: 20-foot or 40-foot containerized housing with full insulation
-
Temperature: 850 C 1100 °C operation, meeting WHO and EU standards
-
Burners: Italian-made Riello or Baltur automatic monoblock type
-
Control: PLC-based temperature monitoring and automatic burner control
-
Chimney: Stainless-steel stack with refractory base and optional wet scrubber
3. Technical Advantages
-
Complete Sterilization: Two-stage combustion ensures total destruction of pathogens and sharps.
-
High-Efficiency Combustion: Optimized air ratio for low fuel consumption and minimal smoke.
-
Environmental Safety: Optional wet scrubber or dry filter system for dust, acid gas, and odor reduction.
-
Containerized Design: Pre-installed, factory-tested system requiring only diesel and electrical connection on site.
-
Durable Construction: Refractory-lined chambers rated for 10-year average service life under normal operation.
4. Applications
-
General and district hospitals
-
Medical centers and clinics
-
Field hospitals, refugee camps, and emergency health units
-
Laboratory and research waste treatment
5. Compliance and Standards
The TS500 conforms to:
-
WHO Safe Management of Wastes from Health-Care Activities (2022)
-
EU Waste Incineration Directive 2000/76/EC
-
China GB 18484-2020 medical waste incineration standard
6. Why Choose HICLOVER
HICLOVER is a professional manufacturer of medical and solid-waste incinerators with international installations across Africa, Asia, and the Middle East. Each system is engineered for reliability, ease of operation, and full compliance with local emission regulations.
7. Contact
For detailed specifications, drawings, and quotations:
Website: www.hiclover.com
Email: sales@hiclover.com
Keywords: Medical Waste Incinerator 500 kg/hr, Diesel Incinerator for Hospitals, Containerized Waste Incinerator, HICLOVER TS500, Hospital Waste Disposal Equipment, On-site Medical Waste Treatment, Mobile Incinerator Unit, Healthcare Waste Management Solution.
mobile incinerator china
of the year is March. Environmental temperature can be such that poor rubber and plastic materials can quickly melt
or deformed. Bidders must ensure all substances are going to have the ability to withstand such temperatures
4) Humidity: humidity is usually high about 65 — 90%. Electronic components must be protected to avoid the effect of
condensation.
5) Dust: this is a major problem especially during the dry season. Dust get into gear and clogs up filters.
Additional protection must be provided where necessary and where applicable spare filters provided to last not less
than five years continuous use. This can be prevented by providing vermin guard where necessary to prevent entry of these
destructive animals.
7) The proposed equipment must conform to the current applicable international standard such as ISO; CE; IEC, ANSI
or BS
8) Language:
equipment must be in English
language
8) Language:
- a) All labels and markings on the equipment must be in English language. b) All software programmes in the proposed
equipment must be in English
language
health center incinerator provider
Number item: 01 system
Could you please send us cataloge info for Pet dog Cremation of dogs, pet cats.
– – – – Please solutions require: General about Cremation system which appropriates.
Burner, 20 kg/hr Burn Capability (min. 1200 kgs. Waste Feed Ability daily) (4-6 humans resources treatments) (Power Supply
380V, 50Hz, 3Ph).
For your things, technical transfer and also training for operators.
Containerized Incinerators Operational Capabilities – – TREATMENT 1 + TONS/ DAY – RAN WITH LIMITED TRAINING – REGULAR
MAINTENANCE CONTAINER BE COMPLETED WITH LIMITED TRAINING – – ABIDES BY EURO/ OR US-EPA DISCHARGE REQUIREMENTS – – CAPACITY TO MELT
SQUANDERED LUBRICANTS (POL) – – HANDLE ORGANIC SOLIDS (TO INCLUDE RMW) – – DEPLOYABLE – MOBILE – 24 HUMANS RESOURCES OF CONTINUOUS USAGE – –
AUTOMATIC LOADING SYSTEM – – AUTOMATED ASH ELIMINATION SYSTEM – – GAS RUBBING SYSTEM – – 95 % REDUCTION OF SOLID WASTE – – RUN
OFF DIESEL OR GAS OIL – – EFFICIENT IN BURNING 4 GADGETS OF WASTE EACH OF GAS – – ABLE TO TAKE ALL COMBUSTIBLE WASTE TO
INCLUDE: PAPER, PLASTIC, CARDBOARD, FOOD, USED OILS, SLUDGE, OILY RAGS, WOOD PALLETS. – – NO PRE-TREATMENT OF WASTE
REQUIRED – – SUPPLIER REPAIR PROVIDE AT VARIABLE OF SHIPMENT – – 5( 5) YEAR ASPECT SOLUTION GUARANTEE FROM DATE OF ACCEPTANCE
Technical Requires – – PROCEDURE GUIDEBOOK in Addition to TRAINING HANDBOOK FOR EACH AND EVERY BURNER – – ESTABLISH Along With ARRANGEMENT
CUSTOMER’S GUIDEBOOK – – BLUE PRINT/ SCHEMATIC OFFERED THAT INFORMATION THE PHY SICAL CAPACITIES OF THE 20′ ′ INCINERATORS –
INCINERATORS MADE UP WITH STURDY ADHERED STRUCTURE – – OPERATED in Addition to LIKEWISE LUGGED IN 20′ ′ BURNERS (CONTAINERS) – –
FULL FRONT in Addition to OPTIONAL BACK GAIN ACCESS TO – – PRIMARY/ SECONDARY TEMPERATURE TAKES CARE OF – – BURNING AIR DAMPER – – VAPOR LIMITED
LIGHT FIXTURES & & & & 120V ELECTRIC OUTLET – – OUTDOOR PLU-IN RECEPTABLE FOR ELECTRICAL SOURCE – – OUTDOOR FUEL TRAIN WITH SHUT-OFF – – LOAD
RAMP – – SKID – PUT GAS STORAGE TANK – – ELECTRICAL AND ALSO GAS OIL CONNECTORS – – CONTROL BOARD in Addition to AIR LOUVER – AIR MANIFOLD
ACCESS in Addition to ENERGY BULKHEAD – – GALVANIZED SHIPMENT COVERS – – GAS, WATER along with OIL ADAPTER LINES – – PRIMARY in Addition to SECONDARY
BURNERS – – TOTALLY INCORPORATED PLC CONTROL SYSTEM – – FACTORY ANALYZED, WIRED BEFORE DELIVERY – – FLEXIBILITY: NO HEAVY LIFT
GADGETS NEEDED FOR ESTABLISH OR TAKE DOWN – – HEIGHT RESTRICTED TO THE HIGHEST POINT ON BASE OR UNDER 15FT HIGH
(adsbygoogle = window.adsbygoogle || []).push({});
As Much As 600kgs per ten-hour day of Kind IV pathological waste or red bag waste rated at 2200 BTU’s per kg, based upon batch