Needs of Heater
1. Need to have prep work, Incineration, Scrubber actions to thaw waste totally in addition to likewise waste gas need to be non-polluted
2. Ash must be just 5% of this waste material
5.
our daily waste generated from all resources is 0.55 kg/bed/day =685kg/day
we want a burner of 150kg/hour filling up ability. The specification of the Heater is as listed below:
Requirements of Burner
1. Should have preparation, Incineration, Scrubber actions to thaw waste entirely and additionally waste gas need to become non-polluted
2.
9. 1 year service warranty
10. ISO Licensed
11. Mobile Burner
12. Electric
{
(adsbygoogle = window.adsbygoogle || []).push({});|}
(adsbygoogle = window.adsbygoogle || []).push({});
university hospital waste administration group at a tertiary care health center,1250 beeded hsopital.
our everyday waste developed from all sources is 0.55 kg/bed/day =685kg/day
we need an incinerator of 150kg/hour filling up ability.