Doubel Combustion Chamber

All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.

Read More

High Temperature Incineration

Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.

Read More

Get Lastest News

There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation

Read More

Nanjing Clover Medical Technology Co.,Ltd.

Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201

Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.

Latest Post

Waste Incinerators


Basic Info.

Export Markets:Global

Additional Info.

Trademark:CLOVER
Origin:China
Production Capacity:1000 Sets Per Year

Product Description

First, we’re just one manufacturer in China. We are in this field from year 2005 and in that time, we make trading company to oversea. Under support of our customer, like our representative in Egypt, Mr. Ibrahim, solid waste incinerator boiler manufacturers, solid waste incinerator diesel, solid waste incinerator korea, solid waste incinerator manufacturer new hampshire, we start to enlarge our incinerator enterprise. We have our own workshop in Nanjing city liuhe economical zone and we’ve got 20-30 workers. Up to now, oversea market is own principal marketplace and from year 2011, we will dig China market.

Abandoned Object Incinerator


Basic Info.

Export Markets:Global

Additional Info.

Trademark:clover

Product Description

Incinerator is a incineration equipment, direct fire waste by gasoline fuel or oi fuel. As distinct circumscription, incinerator can be termed many words as under: 

Treatment capacity: Small scale incinerator, large scale incinerator and incineration pant.  Famous Incinerator manufacturer firm: Inciner8(UK), Clover Incinerator(China), Pennram (USA), Haat (India)  Burning Rate: 5kgs/hour, 10 kgs/hour, 15 kgs/hour, 20 kgs/hour, 30 kgs/hour, 50 kgs/hour, 100 kgs/hour, 150 kgs/hour, 300 kgs/hour, 500 kgs/hour 

Pyrolytic incineration technical is traditional waste treatment way for several years. All around the world, in most countries, people anti incinerator since the incinerator will create a large Dioxin in the smoke. “Dioxins” refers to a group of toxic chemical compounds that share certain chemical structures and biological characteristics. Dioxins can be released into the small scale incinerator for home, small scale incinerator for homes, small scale incinerator for solid waste, small scale incinerator for solid waste at cost of $250000, environment through forest fires, backyard burning of trash, certain industrial activities, and residue from past commercial burning of waste. Dioxins break down very slowly and past releases of dioxins from both natural and man-made sources still exist in the environment. Anyhow, we must remind this, that is large scale incineration pant, generally greater than 30 ton each day. This is a societal problem, to analyze and suggest ways in different angles from the general public, government, economic development, environmental protection, technology development, etc..

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

Melt blown Production Line 400mm and 1600mm and ES Fiber Production Line and N95 Mask Machine and Disposable Mask Machine


1. ES Fiber Production Line

 

 

 

N95 Face Mask Machine Production Line

Melt blown Production Line

 

A.)Optional Capacity: 1600mm

Performance: 95-97percent

FOB Term Price: USD per pair

Price Valid: 5days.

Ave.60 Days prepared for shipping.

In stock Price: USD per pair

 

 

B.)Optional Capacity: 400mm

Performance: 40-50%.

FOB Term Price: USD per pair

Price Valid: 5days.

Ave.20 Days prepared for shipping.

Payment: TT 70% beforehand, TT 30% before leave factory

Shipping: 1*20′ container per pair, Ave. 2000Kgs.

 

Main Parts: Extruder, mould, winder, oven, ultrasonic

Daily Capacity:100-150Kgs/24Hours

Screw extruder:100-150Kgs

Motor power: 15KW frequency conversion speed regulation Reducer speed ratio: 1:10 or 1:16 Screw length to diameter ratio: 30: 1 Screw diameter: 50mm Winding machine diameter: £ 630mm Winding machine drive motor power: 0.55kw speed ratio of winder drive reducer (if any): 1:71 Air heater power: 15kw Power of vacuum calciner: 12kw The size of vacuum calciner: 500 × 300 × 200 Ultrasonic power: 1800, frequency 28kHZ Ultrasonic sink size: 800 × 300 × 250

 

 

2020-04-20



HICLOVER – Medical Environmental 

Tel: +86-25-8461 0201
Email4: [email protected]

Website2: www.clover-incinerator.com|WhatsApp: 008613813931455
Wechat: 008613813931455
Email2: [email protected]
Website1: www.hiclover.com


 

1. ES Fiber Production Line

Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

 


New Courtice incinerator hits further delays


from: http://www.durhamregion.com/news-story/5682601-new-courtice-incinerator-hits-further-delays/

CLARINGTON — Clarington’s new energy-from-waste facility is going to be delayed a second time since the boilers aren’t operating properly and the continuing startup period could cost Durham Region an extra $1 million.

“I would rather see it delayed and done right than hurried,” said Clarington Mayor Adrian Foster.

The Durham York Energy Centre facility, located in Courtice, was scheduled to be fully operational on Dec. 14, 2014. Now the Durham York Energy Centre is not expected to be in full working order before the last quarter of 2015.

The significant systems of the EFW facility have been analyzed. The boiler temperature is high enough for the combustion process but the steam temperature isn’t high enough, and officials aren’t sure what the issue is, says Durham’s functions commissioner, Cliff Curtis.

The steam temperature has to be high enough to push the turbine-generator. If the steam is too cool it can damage the turbine.

“It’s like running a car without oil,” said Mr. Curtis.

Covanta, the company building and operating the facility for Durham and York regions, has taken the boilers down for modifications, according to Mr. Curtis. It’s expected to take three weeks to the repairs and modifications. Then there’ll be a four-week demonstration period, followed by a 30-day acceptance test.

“We’re not getting the temperature we expected from the boiler. Once we get the temperature up, I think everything will fall into place,” said Mr. Curtis. “It’s Covanta’s problem to provide us the product that performs the way they said, so they are going to take the time that they need.”

The delay means additional consultant costs for construction management, legal advice and baseline ambient air monitoring. A Durham Region works report stated Durham’s share of the extra costs is $1 million, which can be offered from a temporary draw the solid waste management reserve fund.

“What is the final price going to look like?” Stated Clarington Regional Councillor Joe Neal, who added that he still has concerns about the emissions fulfilling the Ministry of Environment rules. “There are clearly issues with getting it started out.”

Since Jan. 16, Durham has been charging Covanta a $10,000-a-day late fee for each day the EFW facility is not fully operational. The invoice has been delivered to Covanta, but it hasn’t been paid yet, according to Mr. Curtis.

In mid-February, the incinerator began burning its first haul of curbside garbage. It was part of a testing phase before the facility opens fully.

Durham cancelled landfill contracts and began sending garbage to the Courtice facility. Some garbage was burned at the EFW plant during the evaluation period, without producing power to the grid. Covanta has also been sending the trash to its incinerator in New York state, or landfills in the Niagara area.

Until the EFW facility is up and running, the Region only pays Covanta half price of the agreed upon per-tonne fee. However, Durham isn’t earning any money until the plant is fully operational and selling power back on the grid.

“We’re still on budget. I would rather be getting electricity sales on the grid,” said Mr. Curtis.

The plant construction is coming in slightly under budget, according to the functions commissioner.

There are a few loose ends that could end up costing Durham Region more cash. There is still debate with former property owners on the value of the land expropriated for the center, and a ruling is not expected until fall of next year. The final price for the utility construction and link costs is expected in coming months. The baseline ambient air monitoring runs until the EFW facility is operational, so the delay in opening signifies an ongoing monitoring price.

“There’s some small cost over-runs on some of the smaller things but generally we’re financially on track to bring this in on budget and we look forward to having it on line by the end of the year,” said Mr. Curtis.

HOW THIS IMPACTS YOU

The Durham York Energy Centre is designed to process up to 140,000 tonnes of waste every year, and create 17.5 gross megawatts of renewable energy — sufficient to power between 10,000 and 12,000 homes. A vital part of the economic situation for the energy-from-waste facility is dependent upon it generating electrical power revenue.


Animal Carcass Incinerator


Basic Info.

Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Additional Info.

Trademark:CLOVER

Product Description

Key Features:  * All versions with Dual combustion chamber.  * Stainless Steel chimney/stack, long life. *according to order  * High temperature, long life of incinerator.  * Free or minimum installation on site.  * High burn rate, from 10kgs to 500kgs per hour, up to 6ton per day.  *according to order  * New Design for pet animal cremation company.  * One year warranty on incinerator and parts in stock. 

Presently, we provide different series for local client requirements and design updated incinerator with our leading technology. Animal iacinerator, creature incincerator pricing, animal incineration, animal incineration emerging technologu, animal incineration equipment in china, animal incineration equipment  Costs, The updated design feature of our assortment of incinerators make them one of the most cost effective in the world.

Items Specification
YD Model YD-30 / YD-50 / YD-100 / YD-150 / YD-200 / YD-300 / YD-500 / YD-600
Main Product List Primary Combustion Chamber
Secondary Combustion Chamber
Mix Combustion Chamber
Smoke Filter Chamber
Incinerator Common Control Case
Stainless Steel Chimney
Italy oil/gas burner: 02 units
Oil Tank (if oil fuel)